17. IVV Plan

Document status:

  • initial
  • verified
  • published

Elements needed to integrate, verify and validate the system. (Integration plan, verification plan, validation plan, qualification plan)

17.1. IVV activities

  • Planning
    • pm1_16: Verify PP
  • Project Control
    • pm3_1: Evaluate Progress
    • pm3_2: Address Risk
    • pm3_3: Justify
  • Requirements Engineering
    • sr2_2: Verify StRS
    • sr2_3: Validate StRS
    • sr2_6: Verify SysRS and SERS
    • sr2_7: Validate SysRS
    • sr2_8: Update Traceability
    • sr2_9: Update IVV
  • Architecture
    • sr3_2: Functional trade-offs
    • sr3_4: Physical trade-offs
    • sr3_5: Verify System Design
    • sr3_6: Update IVV
    • sr3_8: Verify System Manual
  • Construction
    • sr4_3: Verify System
  • IVV
    • sr5_1: Verify IVV plan and procedures
    • sr5_2: Integrate System
    • sr5_3: Verify System
    • sr5_4: Validate System
    • sr5_7: Verify Operation Guide
  • Delivery
    • sr6_1: Review Product
    • sr6_4: V&V Maintenance and Training
    • sr6_6: Transition to Manufacturing and support

17.2. Integration Strategy

TBD: integration strategy regarding the System Elements Requirements and interfaces.

17.3. Environmental constraints

None.

17.4. IVV Requirements

None.

17.5. Special procedural requirements

None.