Welcome to SWPLM 29110-5-6-2 Templates’s documentation!¶
Contents:
- 1. Statement of Work (SoW)
- 2. Stakeholder Requirements Specification (StRS)
- 3. Project Data Model
- 4. Project Plan
- 4.1. References
- 4.2. System Description
- 4.3. Purpose
- 4.4. General Acquirer Requirements
- 4.5. Scope
- 4.6. Objectives
- 4.7. Deliverables
- 4.8. System Breakdown Structure
- 4.9. Tasks
- 4.10. Estimated Task Duration
- 4.11. Resources
- 4.12. Composition of Work Team
- 4.13. Schedule
- 4.14. Milestones
- 4.15. Estimated Effort and Cost
- 4.16. Risk Management
- 4.17. Configuration Management
- 4.18. Change Control Process
- 4.19. Delivery Instructions
- 4.20. Disposal Management Approach
- 5. Software Engineering Management Plan (SEMP)
- 5.1. Technical Description
- 5.2. Definitions
- 5.3. Relationships with ISO/IEC 29110
- 5.4. Overview of Processes, Activities, Tasks, Roles and Products
- 5.5. Description of Processes, Activities, Tasks, Steps, Roles and Products
- 5.6. Templates
- 5.7. Examples
- 5.8. Checklists
- 5.9. Tools
- 5.10. References to other Standards and Models
- 5.11. References
- 5.12. Evaluation form
- 6. System Design
- 7. System Requirements Specification
- 8. System Element Requirements Specification
- 9. Interface Specification (BLE Protocol)
- 10. Purchase Order
- 11. Progress Status Record
- 12. Change Request
- 13. Justificaton Document
- 14. Correction Register
- 15. Traceablity Matrix
- 16. Meeting Record
- 17. IVV Plan
- 18. IVV Procedures
- 19. Integration Report
- 20. Verification Report
- 21. Validation Report
- 22. Maintenance Guide
- 23. Operation Guide
- 24. System User Manual
- 25. System Training Specification
- 26. Product Acceptance Record
- 27. ISO 29910-5-6-2 PM Activities
- 27.1. PM.1: Planning
- 27.1.1. PM.1.1: Review SoW
- 27.1.2. PM.1.2: Define Delivery Instructions
- 27.1.3. PM.1.3: Define SBS
- 27.1.4. PM.1.4: Define Milestones
- 27.1.5. PM.1.5: Define Tasks
- 27.1.6. PM.1.6: Estimate
- 27.1.7. PM.1.7: Identify Resources
- 27.1.8. PM.1.8: Define WT
- 27.1.9. PM.1.9: Schedule Tasks
- 27.1.10. PM.1.10: Estimate Cost
- 27.1.11. PM.1.11: Identify Risk Management
- 27.1.12. PM.1.12: Identify Disposal Approach
- 27.1.13. PM.1.13: Identify CM Strategy
- 27.1.14. PM.1.14: Define Scope
- 27.1.15. PM.1.15: Integrate PP
- 27.1.16. PM.1.16: Verify PP
- 27.1.17. PM.1.17: PP Acceptance
- 27.1.18. PM.1.18: Establish Project Repository
- 27.1.19. PM.1.19: Assign Tasks
- 27.2. PM.2: Execution
- 27.3. PM.3: Control
- 27.4. PM.4: Closure
- 27.1. PM.1: Planning
- 28. ISO 29910-5-6-2 SR Activities
- 28.1. SR.1: Initiation
- 28.2. SR.2: Requirements Engineering
- 28.2.1. SR.2.1: Elicit Requirements
- 28.2.2. SR.2.2: Verify StRS
- 28.2.3. SR.2.3: Validate StRS
- 28.2.4. SR.2.4: Elaborate SysRS and Interfaces
- 28.2.5. SR.2.5: Elaborate SERS and System Interfaces
- 28.2.6. SR.2.6: Verify SysRS and SERS
- 28.2.7. SR.2.7: Validate SysRS
- 28.2.8. SR.2.8: Update Traceability
- 28.2.9. SR.2.9: Update IVV
- 28.3. SR.3: Architecture
- 28.4. SR.4: Construction
- 28.5. SR.5: IVV
- 28.6. SR.6: Delivery
Indices and tables¶
ISO 29910-5-6-2 Process Products¶
Statement of Work (SOW)¶
- [PM.1.1: Review SoW](iso29110-5-6-2-PM.md#pm11-review-sow)
Project Plan¶
Project Plan status diagram:

- [PM.1.2: Define Delivery Instructions](iso29110-5-6-2-PM.md#pm12-define-delivery-instructions)
- [PM.1.3: Define SBS](iso29110-5-6-2-PM.md#pm13-define-sbs)
- [PM.1.4: Define Milestones](iso29110-5-6-2-PM.md#pm14-define-milestones)
- [PM.1.5: Define Tasks](iso29110-5-6-2-PM.md#pm15-define-tasks)
- [PM.1.6: Estimate](iso29110-5-6-2-PM.md#pm16-estimaet)
- [PM.1.7: Identify Resources](iso29110-5-6-2-PM.md#pm17-identify-resources)
- [PM.1.8: Define WT](iso29110-5-6-2-PM.md#pm18-define-wt)
- [PM.1.9: Schedule Tasks](iso29110-5-6-2-PM.md#pm19-schedule-tasks)
- [PM.1.10: Estimate Cost](iso29110-5-6-2-PM.md#pm110-estimate-costs)
- [PM.1.11: Identify Risk Management](iso29110-5-6-2-PM.md#pm111-identify-risk-management)
- [PM.1.12: Identify Disposal Approach](iso29110-5-6-2-PM.md#pm112-identify-disposal-approach)
- [PM.1.13: Identify CM Strategy](iso29110-5-6-2-PM.md#pm113-identify-cm-strategy)
- [PM.1.14: Define Scope](iso29110-5-6-2-PM.md#pm114-define-scope)
- [PM.1.15: Integrate PP](iso29110-5-6-2-PM.md#pm115-integrate-pp)
- [PM.1.16: Verify PP](iso29110-5-6-2-PM.md#pm116-verify-pp)
- [PM.1.17: PP Acceptance](iso29110-5-6-2-PM.md#pm117-pp-acceptance)
- [PM.1.19: Assign Tasks](iso29110-5-6-2-PM.md#pm119-assign-tasks)
- [PM.2.4: Conduct STK Meetings](iso29110-5-6-2-PM.md#pm24-conduct-stk-meetings)
- [SR.1.1: Revise Project Plan](iso29110-5-6-2-SR.md#sr11-revise-project-plan)
Data Model¶


- [SR.1.3: Generate Data Model](iso29110-5-6-2-SR.md#sr13-generate-data-model)
Stakeholders Requirement Specifications (StRS)¶


- [SR.2.1: Elicit Requirements](iso29110-5-6-2-SR.md#sr21-elicit-requirements)
- [SR.2.2: Verify StRS](iso29110-5-6-2-SR.md#sr22-verify-strs)
- [SR.2.3: Validate StRS](iso29110-5-6-2-SR.md#sr23-validate-strs)
System Design Document (SDD)¶


- [SR.3.1: Functional Design](iso29110-5-6-2-SR.md#sr31-functional-design)
- [SR.3.3: Physical Design](iso29110-5-6-2-SR.md#sr33-physical-design)
- [SR.3.5: Verify System Design](iso29110-5-6-2-SR.md#sr35-verify-system-design)
Systems Engineering Management Plan (SEMP)¶


- [SR.1.2: Generate SEMP](iso29110-5-6-2-SR.md#sr12-generate-semp)
System Requirements Specifications (SysRS)¶


- [SR.2.4: Elaborate SysRS and Interfaces](iso29110-5-6-2-SR.md#sr24-elaborate-sysrs-and-interfaces)
- [SR.2.6: Verify SysRS and SERS](iso29110-5-6-2-SR.md#sr26-verify-sysrs-and-sers)
- [SR.2.7: Validate SysRS](iso29110-5-6-2-SR.md#sr27-validate-sysrs)
System Elements Requirements Specifications (SERS)¶


- [SR.2.5: Elaborate SERS and System Interfaces](iso29110-5-6-2-SR.md#sr25-elaborate-sers-and-system-interfaces)
- [SR.2.6: Verify SysRS and SERS](iso29110-5-6-2-SR.md#sr26-verify-sysrs-and-sers)
Change Request¶

IVV Plan¶


- [SR.2.9: Update IVV](iso29110-5-6-2-SR.md#sr29-update-ivv)
- [SR.3.6: Update IVV](iso29110-5-6-2-SR.md#sr36-update-ivv)
- [SR.5.1: Verify IVV plan and procedures](iso29110-5-6-2-SR.md#sr51-verify-ivv-plan-and-procedures)
IVV Procedures¶


- [SR.2.9: Update IVV](iso29110-5-6-2-SR.md#sr29-update-ivv)
- [SR.3.6: Update IVV](iso29110-5-6-2-SR.md#sr36-update-ivv)
- [SR.5.1: Verify IVV plan and procedures](iso29110-5-6-2-SR.md#sr51-verify-ivv-plan-and-procedures)
Product Acceptance Record¶


- [SR.5.4: Validate System](iso29110-5-6-2-SR.md#sr54-validate-system)
- [SR.6.1: Review Product](iso29110-5-6-2-SR.md#sr61-review-product)
- [SR.6.4: V&V Maintenance and Training](iso29110-5-6-2-SR.md#sr64-vv-maintenance-and-training)
- [PM.4.1: Formalize Completion](iso29110-5-6-2-PM.md#pm41-formalize-completion)
- [SR.6.6: Transition to Manufacturing and support](iso29110-5-6-2-SR.md#sr66-transition-to-manufacturing-and-support)
Purchase Order¶


- [SR.3.1: Functional Design](iso29110-5-6-2-SR.md#sr31-functional-design)
- [SR.3.3: Physical Design](iso29110-5-6-2-SR.md#sr33-physical-design)
- [PM.2.3: Conduct WT Meetings](iso29110-5-6-2-PM.md#pm23-conduct-wt-meetings)
Traceability Matrix¶

System User Manual¶

- [SR.3.7: Create System Manual](iso29110-5-6-2-SR.md#sr37-create-system-manual)
- [SR.3.8: Verify System Manual](iso29110-5-6-2-SR.md#sr38-verify-system-manual)
System Operation Guide¶

- [SR.5.6: Document Operation Guide](iso29110-5-6-2-SR.md#sr56-document-operation-guide)
- [SR.5.7: Verify Operation Guide](iso29110-5-6-2-SR.md#sr57-verify-operation-guide)
System Maintenance Document¶

- [SR.6.2: Document Maintenance Manual](iso29110-5-6-2-SR.md#sr62-document-maintenance-manual)
- [SR.6.4: V&V Maintenance and Training](iso29110-5-6-2-SR.md#sr64-vv-maintenance-and-training)
System Training Specifications¶

- [SR.6.3: Document Training Spec](iso29110-5-6-2-SR.md#sr63-document-training-spec)
- [SR.6.4: V&V Maintenance and Training](iso29110-5-6-2-SR.md#sr64-vv-maintenance-and-training)
Process Reports¶
Correction Register¶

Integration Report¶

Justification Document¶

Meeting Record¶

Progress Status Record¶

Validation Report¶

Verification Report¶

Process Meta Elements¶
System¶
System: Defined by Stakeholders Requirements Document


- [SR.5.2: Integrate System](iso29110-5-6-2-SR.md#sr52-integrate-system)
- [SR.5.3: Verify System](iso29110-5-6-2-SR.md#sr53-verify-system)
- [SR.5.4: Validate System](iso29110-5-6-2-SR.md#sr54-validate-system)
- [SR.5.5: Correct Defects](iso29110-5-6-2-SR.md#sr55-correct-defects)
Product¶
Product: defined in Project Plan


- [SR.6.1: Review Product](iso29110-5-6-2-SR.md#sr61-review-product)
- [SR.6.5: Perform Delivery](iso29110-5-6-2-SR.md#sr65-perform-delivery)
- [PM.4.1: Formalize Completion](iso29110-5-6-2-PM.md#pm41-formalize-completion)
Project Repository¶
Project Repository: defined in [Project Plan](../rst/PROJ-ProjectPlan.rst#configuration-management)

[PM.1.18: Establish Project Repository](iso29110-5-6-2-PM.md#pm118-establish-project-repository)

[PM.2.6: Repository Management](iso29110-5-6-2-PM.md#pm26-repository-management)

[PM.4.2: Update Repository](iso29110-5-6-2-PM.md#pm42-update-repository)

[PM.2.7: Recover Repository](iso29110-5-6-2-PM.md#pm27-recovery-repository)

Stateless meta elements¶
- Implementation Environment: defined in Project Plan
- Disposed System: [defined in Project Plan](../rst/PROJ-ProjectPlan.rst#disposal-management-approach)
- Project Repository Backup: [defined in Project Plan](../rst/PROJ-ProjectPlan.rst#backup-and-recovery)
- System Elements: [defined in Data Model](../rst/PROJ-DataModel.rst#system-elements)