2. Stakeholder Requirements Specification (StRS)

Document status:

  • initial
  • approved
  • baselined

Stakeholder Requirements Specification (StRS)

Defines the acquirer and other stakeholder’s requirements.

2.1. Introduction

TBD: general description of the main goals, needs and expectations

2.2. Requirements Description

2.2.1. Regulatory

  • TBD

2.2.2. Capabilities

  • TBD

2.2.3. Performance

  • TBD

2.2.4. Scenarios

  • TBD

2.2.5. Concepts of operations

TBD

2.2.6. User interface

TBD

2.2.7. Interfaces

TBD

2.2.8. Reliability

TBD

2.2.9. Maintenance

TBD

2.2.10. Interoperability

  • TBD

2.2.11. Constraints

  • TBD