2. Stakeholder Requirements Specification (StRS)¶
Document status:
- initial
- approved
- baselined
Stakeholder Requirements Specification (StRS)
Defines the acquirer and other stakeholder’s requirements.
2.1. Introduction¶
TBD: general description of the main goals, needs and expectations
2.2. Requirements Description¶
2.2.1. Regulatory¶
- TBD
2.2.2. Capabilities¶
- TBD
2.2.3. Performance¶
- TBD
2.2.4. Scenarios¶
- TBD
2.2.5. Concepts of operations¶
TBD
2.2.6. User interface¶
TBD
2.2.7. Interfaces¶
TBD
2.2.8. Reliability¶
TBD
2.2.9. Maintenance¶
TBD
2.2.10. Interoperability¶
- TBD
2.2.11. Constraints¶
- TBD